Pages

Showing posts with label US. Show all posts
Showing posts with label US. Show all posts

Thursday, October 17, 2013

Government reopens

The partial shutdown of the Federal Government that lasted 16 days ended today and the FCC systems come back online. Access to the OET system, which includes electronic filing and the OET knowledge base has been restored. TCBs are now able to issue grants of certification and perform research on pending applications.

Friday, September 27, 2013

Government Shutdown impact on FCC certifications

Closed Sign in Yellowstone

Closed Sign in Yellowstone (Photo credit: bmills)

Preparations are being made at the FCC for the potential of yet another imminent Federal government shutdown if a funding bill agreement can’t be reached by Sept. 30th.

The FCC has indicated that in the unlikely event of a government shutdown, that access to all FCC systems will be suspended.

The Equipment Authorization system, used by the FCC and Telecommunication Certification Bodies (TCB) to process certifications and issue grants of equipment authorizations will be among such systems to go off line, thus having the potential to delay or halt pending product certifications and preventing manufacturers from marketing and selling affected product.

Tuesday, June 18, 2013

5 GHz band rules comment period extended

80211a-5-ghz-spectrum

80211a-5-ghz-spectrum (Photo credit: sam_churchill)

FCC has extended the commenting period to July 24th, 2013 on the Notice of Proposed Rulemaking (NPRM) - Revision of Part 15 of the Commission’s Rules to Permit Unlicensed National Information Infrastructure (U-NII) Devices in the 5 GHz Band.

The above rulemaking will have a significant impact on unlicensed device spectrum use and affect devices that operate in the 5 GHz band, devices that use wide band data transmission techniques such as the emerging  802.11ac wireless standard for example. The complexity of the technologies embedded in such systems to deal with the spectrum utilization requirements can have a direct impact on the cost of such devices.

For a briefing on some of the proposed changes in the NPRM, see http://www.emcrules.com/2013/02/fcc-opens-more-5ghz-spectrum.html

The request for extension was made by IEEE 802 Committee and the WiFi Alliance to enable more time for review and commenting on technical and policy issues.  The FCC noted that comment extensions are not a routine practice, but given the importance of this proceeding, they found it appropriate for the development of a full and complete record.

REF:

ORDER Extended Reply Comment Date: July 24, 2013

Tuesday, April 10, 2012

Wireless handset hearing aid compatibility standard adopted

Hearing aid types (300dpi)

Hearing aid types (300dpi) (Photo credit: Wikipedia)

The FCC has formally adopted ANSI C63.19 2011 as an applicable technical standard for evaluating the hearing aid compatibility of wireless phones.

As specified in the Second Further Notice, the new rules permit the use of either ANSI C63.19 2007, or ANSI C63.19 2011  for the testing of new handset models. All existing grants issued under the 2007 standard, as well as any pre-2010 grants remain valid, thus, no existing handset models will require retesting or recertification for hearing aid compatibility.

A 12 month transition period has been adopted for testing of multi-band and multi-mode handsets that incorporate operations which are not covered under the 2007 ANSI Standard. The Report and Order recognizes that as the new rules become effective, some manufacturers will be in production cycles where it will be impractical to return to a testing cycle for upcoming multi-band or multi-mode handsets under the 2011 ANSI Standard. Specifically, during the transition period, and as an alternative to using the 2011 standard, manufacturers may certify handsets as hearing aid compatible if they meet all compatibility criteria under the 2007 ANSI standard for all operations covered by that standard, providing they meet the disclosure requirements set forth in the order. After the transition period, all new handsets that contain operations not covered by the 2007 version will need to comply with the 2011 ANSI standard.

The Report and Order makes it clear that evaluations performed partly under one version of the ANSI standard, and partly under another, is incompatible with existing rules, thus manufacturers must test exclusively with one of the applicable versions.

Ref;

http://transition.fcc.gov/Daily_Releases/Daily_Business/2012/db0409/DA-12-550A1.pdf

http://www.emcrules.com/2011/11/hearing-aid-compatibility-for-wireless.html

Thursday, March 29, 2012

FCC Amends Rules for Tank Level Probing Radar

The FCC announced on Tuesday that they are expanding the scope of the proceeding proposed to cover Tank Level Probing Radar (TLPR) devices, originally applicable only to devices operating in the 77-81 GHz band, and contained within steel or concrete tanks. Citing requests for waivers and other inquiries as evidence of the increasing demand for a comprehensive set of guidelines for general level probing radar (LPR), to allow the use outdoors and on other frequencies, the FCC is proposing an amendment to Part 15 rules that would apply to the operation of LPR devices installed in both open-air environments and inside storage tanks in the following frequency bands:  5.925-7.250 GHz, 24.05-29.00 GHz, and 75-85 GHz.

Level probing radar applications are diverse but among the popular uses are process control systems used to measure the amount of various substances such as liquids and granulates.

Ref;

FCC 12-34A1

ET Docket Nos. 10-23, 06-216 and 07-96, 25 FCC Rcd 601 (2010). 

Friday, January 20, 2012

Digital Transmission Systems and Broadband over Power line among newly published FCC knowledge database (KDB) articles

Logo of the United States Federal Communicatio...

Image via Wikipedia

The Office of Engineering and technology maintains a knowledge database at https://apps.fcc.gov/kdb . The primary function of this service is to provide the public a means to research answers to equipment authorization questions. For questions that are particularly complex, frequently asked, or often misinterpreted, the FCC provides guidance documents on the subject.

Among the latest of these guidance documents , are guidance for performing measurements on Digital Transmission Systems (DTS), and an answer to the question “What are the measurement guidelines for equipment authorization for BPL systems?”

For Digital Transmission Systems (DTS), the primary changes are;

  • A revision and expansion of spectrum analyzer-based measurement methodologies.
  • A revision to the procedure for measuring power spectral density.
  • An expansion of guidance for measuring unwanted (out-of-band) emissions.
  • A new provision to permit antenna port conducted measurement of unwanted emissions in
    restricted bands.

For BPL, or, Broadband over Power line Systems, the FCC points to Second Report and Order FCC 11-160, namely Appendix D of the order, for measurement guidelines on these devices, this includes both in-house BPL and Access BPL. The rules that govern FCC compliance of BPL systems were revised In October of 2011. See my October 2011 article for background and history on this topic.

Wednesday, November 2, 2011

Hearing aid compatibility for wireless handsets

Hearing aid, photo taken in Sweden

Image via Wikipedia

FCC publishes Second Further Notice of Proposed Rulemaking covering wireless hearing aid compatibility rules for handsets. Interested parties may file comments and reply comments on or before December 1st and December 16th respectively.

FCC seeks comments on conclusion to adopt the new 2011 ANSI standard into the Commission’s rules as applicable technical standard for evaluating hearing aid compatibility of wireless phones. The proposal is to adopt the new standard as “permissible” rather than mandatory, with the intent to ease burdens on manufacturers.

Within the discussion of the proposed rulemaking document, the FCC “tentatively concludes that the adoption of the new technical standard would not raise any major compliance issues or impose materially greater obligations with respect to newly covered frequency bands and air interfaces than those already imposed under Commission rules”.

Under the proposed rules, a manufacturer will be permitted to submit for certification using either the 2007 version, or the 2011 version of the ANSI standard.

Tuesday, August 23, 2011

FCC publishes new draft testing guidelines for U-NII devices

One of the "kegs" used by Toronto Hy...

Image via Wikipedia

Public comment is now open, until September 23, 2011, on the FCC guidelines for testing Unlicensed National Information Infrastructure (U-NII) devices, in accordance with CFR 47 Part 15, Subpart E.

In addition to the measurement standards called out in section 15.31, and ANSI C63.10, these guidelines will form the general test procedures for testing all U-NII devices for compliance with the technical requirements of section 15.407.

The U-NII radio band is an unlicensed band divided into three spectrum segments in the 5GHz range, 5.15–5.35 GHz, 5.47–5.725 GHz and 5.725–5.825 GHz. U-NII devices use wideband digital modulation techniques, and provide a wide array of high data rate mobile and fixed communications for individuals, businesses, and institutions. Examples are 802.11a devices.

Dynamic Frequency Selection (DFS) functions, which are required between 5.25 – 5.35 GHz and between 5.47 – 5.725 GHz for the protection of government radar systems, are covered in a separate document. See FCC Order, ET Docket No.03-122 (FCC 06-96).

For devices that transmit on multiple outputs simultaneously such as MIMO and beam forming technologies, FCC KDB Publication Number 662911 also applies.

The new guidance replaces Public Notice DA 02-2138 of 8/30/02 and contains the following changes;

  • The document interprets and clarifies the language of 15.407(a)(4) (maximum conducted output power)
  • Revises the spectrum analyzer-based methodologies for measuring maximum conducted power and provides an option to use an RF power meter
  • Revises the methodologies for measuring Peak Power Spectral Density (PPSD) to match those used to measure maximum conducted output power
  • Specifies the use of max hold when measuring Emission Bandwidth (EBW)
  • Defines compliance with 15.407(a)(6) (peak excursion) in terms of the ratio of maximum of the peak-hold spectrum to the maximum of the average spectrum—eliminating the need to compute the ratio at each frequency (a process that had resulted in unintended failures near band edges)
  • Adds guidance for measuring unwanted emissions.  The guidance interprets the non-restricted band limit as a peak limit and restricted band limits as including both average and peak limits.  Both restricted and non-restricted band limits are based on continuous transmission with no subsequent reduction for operational duty cycle.  The guidelines permit both restricted and non-restricted band compliance be demonstrated by radiated measurements or by antenna-port conducted measurements combined with radiated cabinet emission measurements.

By:

Thursday, August 4, 2011

Spectrum Sharing agreements with Canada and Mexico, announced by the FCC

The FCC reached agreements with Canada and Mexico for sharing commercial wireless broadband spectrum in the 700MHz band along the respective boarders, additionally, an arrangement has been made with Canada for sharing spectrum in the 800MHz band.

The goal of these arrangements is to further the deployment of commercial wireless broadband services near the boarder, with an aim to providing consumers additional options for 4G high speed mobile broadband access in these areas.

The arrangements made with respect to the 800MHz band on the northern boarder are inline with the 800MHz rebanding efforts by U.S. public safety and ESMR (Enhanced Specialized Mobile Radio) i.e. Nextel. Specifically the allotment of channels between the US and Canada, technical operational parameters within 87 miles of the boarder, and setting the schedule for transitioning facilities from US channels to complete the rebanding along the U.S.-Canadian border.

Read the FCC Press release at http://transition.fcc.gov/Daily_Releases/Daily_Business/2011/db0801/DOC-308822A1.pdf

By:

Tuesday, August 2, 2011

Microsoft is designated a TV bands database admin, follows Google

Television set for Wikipedia userbox icons, or...
Image via Wikipedia

Microsoft Corporation received conditional designation by the FCC as a TV bands database administrator. Microsoft joins Google and 8 others, Comsearch, Frequency Finder Inc., KB Enterprises LLC and LS Telcom, Key Bridge Global LLC, Neustar Inc., Spectrum Bridge Inc., Telcordia Technologies, and WSdb LLC. This brings the list of available administrators to 10 in total. 

The TV bands, or television “white spaces” are the unused portions of the broadcast television spectrum, freed by the transition to digital TV. Availability within the spectrum varies with geographical location; the TV bands database is used as a control and coordination measure for the bands. It is required that devices that would use this unlicensed spectrum would include a geo-location capability and access to the database, containing frequencies off limits for use in that area, enabling devices to communicate without interfering with incumbent users. 

Manufacturers of devices are free to choose which database to use in their devices. Database administrators may charge fees for access to the database. In lieu of geo-location and database access, devices can employ hardware that listens to the band, called spectrum sensing, this requires approval by the FCC first, each application must be placed on public notice, and the FCC will conduct tests to evaluate performance prior to approval, which could result in a far more costly product. 

Each approved database administrator must make their database available for a 5 year term. At this time all administrators are conditional and pending, the FCC will announce when and if any particular administrator is available for public use.

By:

Friday, May 27, 2011

US Mexico MRA

Coat of arms of Mexico.

Image via Wikipedia

A new US-Mexico Telecom MRA was signed May 26th 2011, indicated in a press release from the United States Trade Representative.

The agreement is for the recognition of testing laboratories and acceptance of test reports. Mexico will only recognize 3rd party labs. The agreement does not cover recognition of certification bodies. The agreement includes a transition period. Seven accepted  technical regulations (NOMS) are listed in Annex I of the MRA text.