What is a modular approval, how does one qualify for one, and what are some of the advantages and disadvantages in selecting to pursue a modular radio approval. I’ve addressed these questions in summary form here, and I provide some links for further reading.

A modular approval allows the approved product to be installed in different host devices, without the need for additional testing or authorization for the transmitter for each host system. Note that the host itself may still require authorization or reauthorization depending on the host, but the transmitter would not need to be recertified for each host.

There are 4 types of modular approvals;

1. Single-Modular transmitter

2. Limited Single-Modular transmitter

3. Split-Modular transmitter

4. Limited Split-Modular transmitter

A single-modular device is a device in a single package, and a split-modular is one where the radio front end and the control elements section may be separate.

The use of the word “Limited” indicates that the device may have certain grant conditions or be reliant on a specific host configuration for compliance. Integrators are cautioned to pay close attention to these limitations.

To qualify for modular approval, the device must comply with 8 specific conditions. For a Single-modular transmitter, the device is a self contained, physically delineated component that can demonstrate compliance independent of the host.

1. Radio circuitry must be shielded

2. Modulation / data inputs must be buffered.

3. Power supply regulation on the module

4. Permanent antenna or unique connector

5. Must demonstrate compliance stand alone (outside host)

6. Labeled with its own permanently fix FCC ID, or have electronic display capability

7. Must comply with applicable rules, and with grantee provided conditions

8. Must comply with applicable RF exposure requirements

A limited modular approval may be granted when a device does not meet all 8 of the conditions, but may rely on a specific host and applicable operating conditions for compliance. For instance, the shielding, buffered I/O or power regulation may be provided by a specific host. In these cases the module would be “Limited” to the specific host providing those requirements.

The first and probably most obvious benefit to a modular approval is that the radio module would not need to be recertified for every host installation, thus saving time and money when incorporating radio functions into multiple host devices. Other advantages may include;

· Changes to the host don’t affect the radio certification (except on “Limited modular”)

· Time to market for a new host is considerably less if the product does not require certification

· Ease of managing the radio certification, one FCC ID instead of many.

· Flexibility with installation within the host (except maybe on “Limited modular”)

· If the module is the product, it’s more attractive for an integrator to use a pre-certified device.

· The radio may be “End-User” replaceable (potential upgrade or repair)

Some items that may be negative points to a modular approval;

· Radio generally more expensive due to shielding, buffered i/o and power regulation

· Depending on host/antenna placement, transmitter power may be less than non-module type

· Integrating multiple transmitters (co-location) within a single host can be problematic

Things to pay attention to when using an already approved module;

· Be aware of the type of module and grant conditions or restrictions

· The term “Modular approval” is specific, if unsure check the FCC ID and look at the grant

· Follow all installation instructions and warnings provided by the grantee

Other things to possibly consider are RF exposure and/or hearing-aid compatibility, for devices with specific antennas, or specific host/enclosure configurations. The FCC has published a “Transmitter Module Equipment Authorization Guide”, KDB 996369, and I recommend reading through the guide if considering the modular approach.

To check a prospective module’s FCC approval, have the FCC ID ready and visit;

https://apps.fcc.gov/oetcf/eas/reports/GenericSearch.cfm

Keep in mind, the first 3 characters of the FCC ID are the Grantee Code, and note that the numbers 1 or 0 will never be part of the grantee code (to avoid confusion with the letters i and o). The grant will clearly indicate “Modular Approval” or “Limited Modular Approval” (LMA) if the device is so approved. At the time of writing this article, the FCC system only searches based on the legacy system of 3 digit grantee codes, however, the FCC is moving to a 5 digit grantee code system real soon – see http://www.emcrules.com/2012/06/fcc-running-out-of-grantee-codes.html

Compliance testing and certification costs of a Single-Modular transmitter are comparative to that of a non-modular approval of the same radio in most cases, in some cases it could be less expensive due to the simplified test setup and configuration of the module. Time and cost of Limited-Modular devices can vary depending on the host.

Of course this all applies to domestic FCC certification, but what about other regions?

Canada has a very similar approach to radio modules, see RSS-Gen, section 3.2.2 for details. In Europe, there is no “Modular Approval” process as the system is based on self-certification, but a somewhat similar approach can be taken, please see my article “Radio module integration and R&TTE compliance” for dealing with radio modules under the R&TTE Directive.

Tuesday, August 23, 2011

FCC publishes new draft testing guidelines for U-NII devices

One of the "kegs" used by Toronto Hy...

Image via Wikipedia

Public comment is now open, until September 23, 2011, on the FCC guidelines for testing Unlicensed National Information Infrastructure (U-NII) devices, in accordance with CFR 47 Part 15, Subpart E.

In addition to the measurement standards called out in section 15.31, and ANSI C63.10, these guidelines will form the general test procedures for testing all U-NII devices for compliance with the technical requirements of section 15.407.

The U-NII radio band is an unlicensed band divided into three spectrum segments in the 5GHz range, 5.15–5.35 GHz, 5.47–5.725 GHz and 5.725–5.825 GHz. U-NII devices use wideband digital modulation techniques, and provide a wide array of high data rate mobile and fixed communications for individuals, businesses, and institutions. Examples are 802.11a devices.

Dynamic Frequency Selection (DFS) functions, which are required between 5.25 – 5.35 GHz and between 5.47 – 5.725 GHz for the protection of government radar systems, are covered in a separate document. See FCC Order, ET Docket No.03-122 (FCC 06-96).

For devices that transmit on multiple outputs simultaneously such as MIMO and beam forming technologies, FCC KDB Publication Number 662911 also applies.

The new guidance replaces Public Notice DA 02-2138 of 8/30/02 and contains the following changes;

  • The document interprets and clarifies the language of 15.407(a)(4) (maximum conducted output power)
  • Revises the spectrum analyzer-based methodologies for measuring maximum conducted power and provides an option to use an RF power meter
  • Revises the methodologies for measuring Peak Power Spectral Density (PPSD) to match those used to measure maximum conducted output power
  • Specifies the use of max hold when measuring Emission Bandwidth (EBW)
  • Defines compliance with 15.407(a)(6) (peak excursion) in terms of the ratio of maximum of the peak-hold spectrum to the maximum of the average spectrum—eliminating the need to compute the ratio at each frequency (a process that had resulted in unintended failures near band edges)
  • Adds guidance for measuring unwanted emissions.  The guidance interprets the non-restricted band limit as a peak limit and restricted band limits as including both average and peak limits.  Both restricted and non-restricted band limits are based on continuous transmission with no subsequent reduction for operational duty cycle.  The guidelines permit both restricted and non-restricted band compliance be demonstrated by radiated measurements or by antenna-port conducted measurements combined with radiated cabinet emission measurements.

By:

Tuesday, August 2, 2011

Microsoft is designated a TV bands database admin, follows Google

Television set for Wikipedia userbox icons, or...
Image via Wikipedia

Microsoft Corporation received conditional designation by the FCC as a TV bands database administrator. Microsoft joins Google and 8 others, Comsearch, Frequency Finder Inc., KB Enterprises LLC and LS Telcom, Key Bridge Global LLC, Neustar Inc., Spectrum Bridge Inc., Telcordia Technologies, and WSdb LLC. This brings the list of available administrators to 10 in total. 

The TV bands, or television “white spaces” are the unused portions of the broadcast television spectrum, freed by the transition to digital TV. Availability within the spectrum varies with geographical location; the TV bands database is used as a control and coordination measure for the bands. It is required that devices that would use this unlicensed spectrum would include a geo-location capability and access to the database, containing frequencies off limits for use in that area, enabling devices to communicate without interfering with incumbent users. 

Manufacturers of devices are free to choose which database to use in their devices. Database administrators may charge fees for access to the database. In lieu of geo-location and database access, devices can employ hardware that listens to the band, called spectrum sensing, this requires approval by the FCC first, each application must be placed on public notice, and the FCC will conduct tests to evaluate performance prior to approval, which could result in a far more costly product. 

Each approved database administrator must make their database available for a 5 year term. At this time all administrators are conditional and pending, the FCC will announce when and if any particular administrator is available for public use.

By:

Friday, May 27, 2011

Do you mind turning off your RF device please?

Tin Foil Hat
Image by James Provost via Flickr
According to a Parliamentary Assembly of the Council of Europe (PACE) report issued May 6, 2011, “waiting for high level scientific and clinical proof that electromagnetic fields emanating from high frequency sources such as radar, telecommunications and mobile phones may lead to very high health and economic costs”.
PACE will be meeting in Kyiv on May 27th, and hold a debate, and intends to adopt a resolution on the issues raised in the report.
The report invokes heath concerns, in particular using examples of asbestos, lead, and tobacco, as mistakes made in the past when dealing with unknown health risks. The report also likens the potential consequences on the environment by electromagnetic fields with licensing of medication, chemicals, pesticides, heavy metals and genetically modified organisms.
The report recommends that an “as low as reasonably achievable” approach be adopted when setting standards or threshold values for emissions of electromagnetic fields of all types and frequencies. The report urges that particular attention should be given to protecting children, and “electrosensitive” persons suffering from a syndrome of intolerance to EM fields with a call to protect them from the unknown effects of electromagnetic waves by the creation of “Wave-free” areas not covered by wireless networks.
Mobile phones, DECT phones, WiFi, WLAN and WIMAX come under focus in the reports, with the call for microwave long-term exposure thresholds of not to exceed 0.6 v/m and in the medium term reduced to 0.2 v/m. The report also makes recommendations to; undertake risk-assessments prior to licensing new types of devices, calls for additional labeling and indications of health risks, produce warnings and recommendations to use a wired alternative due to the “unknown” dangers of electromagnetic fields..
The report proposes the ban of all mobile phones and wireless networking devices from schools and classrooms.